Transparent pricing
What Does an Arc Flash Study Cost?
Arc flash and power systems studies are priced by device count, number of services, and site count — never hourly. Estimate a range below, then get a written fixed-fee proposal.
Breakers, MCC buckets, disconnects, transformers.
A budgetary range only. Your written fixed-fee proposal comes after a no-cost scoping call — device count and site specifics can move the number.
Rates shown are indicative and calibrated during scoping.
What drives the fee
The single biggest factor is the number of protective devices we model — every breaker, fuse, MCC bucket, disconnect, and transformer becomes a node in your system model. More devices means more field data and more analysis.
Multiple sites add mobilization; multiple studies on the same model cost far less together than separately, because we build the model once and reuse it. If you already have an SKM model, we validate and update it rather than starting over — usually a meaningful discount.
Expedited schedules are available when a shutdown or inspection date is driving the work.
Find out where your facility stands.
A 10-minute call with a licensed PE — we'll tell you what your study should cover and what it should cost. No obligation.
