Arc Flash & Power System Study Case Studies

Real engineering results from real facilities — how standard updates and modeling choices change the numbers behind your PPE requirements, labels, and equipment ratings.

Arc flash · IEEE 1584

A hospital switchboard: 34.56 cal/cm² under the old standard, 23.56 under the new one

We recalculated a county hospital's 480Y/277V system under both IEEE 1584-2002 and IEEE 1584-2018 — same gear, two editions of the standard, and materially different PPE requirements and labels.

34.56 → 23.56 cal/cm²
Main switchboard, 2002 vs. 2018
+8.35 cal/cm²
Largest increase, bus ECLDP
400 kVA
Emergency generator modeled
Read the full case study

Short circuit · VFD modeling

700+ buses, 88 VFDs, one panel where bypass mode changed the answer

On a 700+ bus SKM model with 88 bypass-capable VFD motors, we compared short circuit currents in bypass versus normal mode — and whether one panel exceeded its rating turned entirely on that modeling choice.

2,988 HP
VFD motor load modeled (88 drives)
1 panel
Exceeded its rating — bypass mode only
13.54%
Largest current increase, normal mode
Read the full case study